Evidence baseline: 30 September 2026This is a dated publication, not a live feed.
Oakford Campus Public RecordEvidence, context and current position

P08 · Abernethy Road footpath

The campus requires a footpath connection.

It must link the site to the Tonkin Highway principal shared path (PSP).

Condition R requires Shire-approved plans before a Building Permit is issued, and construction by FRSA before school operations begin.

In short

What Condition R requires

Related corridor works

Road works may affect timing and coordination

The Tonkin Highway Extension works, the Shire's planned rehabilitation and widening of Abernethy Road, drainage, services and the required campus footpath all place demands on the same corridor. This makes levels, staging and construction coordination increasingly important, but does not establish that the Condition R footpath has been approved or delivered.

What the public funding establishes

A funded road-upgrade programme exists

The Shire's July 2026 announcement identifies the Hopkinson–Kargotich section for rehabilitation and widening. The proposed programme is locally significant and may affect corridor coordination.

What it does not establish

The campus footpath remains a separate obligation

Public road funding and construction do not by themselves satisfy Condition R or establish campus readiness.

What remains unresolved publicly

Evidence basis: Operative Condition R; November 2023 responsible-authority material; Shire road-upgrade announcement, 2 July 2026; Shire proposed temporary-road-closure notice, 27 August 2026. The road programme is contextual evidence and is not treated as formal Condition R clearance.