P05 · Design changes

The masterplan has changed.

What changed – and what does it mean?

The May 2026 masterplan uses fewer main buildings, more double-storey or double-height volumes and a different campus layout. It also maps a future expansion concept. The 2023 development approval applies to the earlier plan.

In short

Why this matters

Design evolution

Four stages in the available record

The documents show how FRSA progressively reworked the design after the 2023 proposal was approved. The later stages record design intent and proposed masterplans, not a replacement approval.

Approval baseline

Up to 1,200 students, 546 parking bays, approximately 17,168 m² site coverage and a predominantly single-storey form. Wall finishes were proposed as rammed earth, with light-grey Colorbond roofs.

Approval baseline

Revision brief

FRSA sought a smaller footprint, less fill, closer building clusters, fewer courts and ovals, and greater use of double-storey construction. It stated no material preference and asked that options be assessed for durability and efficiency.

Design intent

Work in progress

A substantially reworked, later-superseded layout showed 729 parking bays and at least three clearly two-storey secondary-school components.

Superseded WIP

Latest accessible masterplan

FRSA's document reduces the main buildings from 17 to 13 and maps secondary-school delivery first, followed by primary. At least six volumes are shaded as double-storey or double-height; the legend does not distinguish between them. No current parking total is stated.

Approval status unresolved

Material changes to examine

What changed in the design

The first school stage is not the whole planning picture. Traffic, parking, event use, noise, water, wastewater, bushfire and emergency planning may need to consider the completed campus and documented future expansion, not only the first build.

Built form

The later masterplan uses fewer main buildings and more double-storey or double-height volumes. The approved design specified rammed-earth wall finishes; by June 2025, FRSA said it had no stated material preference and wanted alternatives assessed for durability and efficiency.

Site layout

Buildings are more tightly clustered, with parts of the developed envelope closer to Kargotich Road and a changed internal circulation pattern.

Staging

The revised delivery sequence places the secondary school first and the primary school second, rather than reproducing the approved staging dates and layout.

Future expansion

The future concept maps secondary expansion south and primary expansion west within the initial fence. It is a long-term concept, not approval to exceed 1,200 students.

Evidence basis: The 2023 development plans are available in the Shire meeting archive. June 2025 Request for Masterplan Revision – Design Brief v3.4; September 2025 work-in-progress material; FRSA's May 2026 Proposed and Future masterplan; FRSA Oakford Project podcast no. 2. Future expansion is a documented concept, not an approval to exceed the current 1,200-student cap.